> ## Content Index
> Fetch the complete content index at: https://www.antoinebuteau.com/llms.txt
> Use this file to discover other available public pages before exploring further.

# How to Build a Second Product Series #6: Fund It, Narrow It, or Stop
- URL: https://www.antoinebuteau.com/build-a-second-product-06-fund-it-narrow-it-or-stop/
- Published: 2026-11-22T23:54:47.000Z
- Updated: 2026-11-22T23:55:12.000Z
- Description: Nadia can bring either customer live without bringing every store live. It took the fictional Rosterline team twenty weeks to get to that choice: four for discovery, twelve to build, and four to run the tests.
- Author: Antoine Buteau
- Tags: #build-a-second-product, Series

Nadia can bring either customer live without bringing every store live. It took the fictional Rosterline team twenty weeks to get to that choice: four for discovery, twelve to build, and four to run the tests.

Time and attendance works profitably on standard-rule sites (83% gross contribution, zero unexplained cycle-2 discrepancies, 44%–48% less manual payroll prep). It fails on complex-overtime sites (-16% contribution, 62% of implementation hours, 71% of escalations, manual CSV fixes still required).

Nadia has three choices:

1. **Fund the full vision.** Double the team to eight engineers and spend six months building a multi-jurisdiction complex-overtime engine so every site can cut over. The cost: Phase 2 of 14-Day Self-Serve Site Onboarding slips into next year, starving the $12M scheduling core.
2. **Stop completely.** Walk away from time and attendance, refund both pilot fees, and revert to partner integrations. The cost: killing a product that Payroll Directors paid $2.50/employee/month for and that passed live parallel verification on 78% of tested sites.
3. **Narrow sharply and roll out with safeguards.** Cut over tested standard-rule sites only, keep complex-rule sites on their incumbent timekeeping system, and protect core onboarding capacity.

## Switch only the stores that passed

Alder & Pine switches its **16 standard-rule stores** ($2,400/month, $28,800 ACV) and keeps its 4 complex stores on the incumbent. Harborline Fresh switches its **12 standard-rule locations** ($1,500/month, $18,000 ACV) and keeps its 4 complex locations on the incumbent. Both Payroll leaders accept the split because Rosterline was transparent with the parallel-test math—and because Marcus and Priya both value accurate paychecks over a premature all-or-nothing cutover.

Nadia writes down what Sales can offer, what Payroll has to verify, and who goes back to scheduling:

- **Hard sales qualification gate.** AEs may sell time and attendance only to standard-rule sites (single-state or standard 40-hour weekly overtime, single pay rate per shift, no meal-penalty or union-CBA rules). Complex sites are explicitly excluded in the order form and stay on incumbents.
- **Mandatory parallel verification.** Every new account completes two consecutive parallel pay cycles and resolves all payroll-affecting discrepancies before cutover. Sites that need unsupported manual corrections stay on the incumbent.
- **Preserve core onboarding capacity.** One build engineer rotates back to core scheduling, leaving **3 engineers, 1 PM (Maya), and 1 implementation lead** on time and attendance. That puts **19 of 22 engineers (86%)** on core—preserving full velocity to ship Phase 2 of 14-Day Self-Serve Site Onboarding.
- **A decision date.** The team agrees now on what would justify putting more money into the product or stopping new sales.

## What earns more funding on September 30

The team will review the rollout on **September 30, in week 16**.

Nadia won’t fund a dedicated complex-overtime engine unless all five conditions are met:

1. **10+ live paying accounts** (at least 120 standard-rule sites, ≥$180K incremental ARR) switched via normal AE motion.
2. **Zero severity-1 payroll-affecting post-cutover incidents** across six consecutive pay cycles.
3. **≥80% gross contribution** and ≤15 implementation hours per account.
4. **Core milestone delivered:** Phase 2 of 14-Day Onboarding live, with median core deployment ≤16 days.
5. **Verified demand for complexity:** At least $250K in qualified pipeline blocked specifically by complex overtime rules.

**Stop rule:** If on September 30 live standard-site ARR is under $100K, gross contribution falls below 70%, or support exceeds 2 escalations per 10 sites per cycle, Rosterline freezes new sales, moves live sites onto maintenance or a 90-day partner migration, and returns all three engineers to core.

## Copyable funding memo

Use this memo to record what you’ll fund now, what you won’t sell yet, and what would change your decision.

```
SECOND-PRODUCT FUNDING & SCOPE DECISION MEMO
Date: [YYYY-MM-DD]
Product / Bet: [Second Product Name]
Single-Threaded Owner: [Name, Role]
Decision: [ ] Fund Full Build  [X] Limited Rollout  [ ] Pause / Stop

1. EVIDENCE TO DATE (SEPARATE BY SEGMENT)
- Paying accounts closed (list price, no founder heroics): [# accounts, $ ACV]
- Parallel / live verification pass rate: [Segment A pass vs. Segment B fail]
- Implementation & support load: [Hours/account; % escalations by segment]
- Direct gross contribution: [% by segment, excluding R&D]

2. EXPLICIT SCOPE & SAFEGUARDS
- In scope (eligible to sell and switch): [Exact ICP / rule boundaries]
- Out of scope (stays on incumbent / disqualified): [Excluded edge cases]
- Mandatory cutover gate: [e.g., 2 parallel cycles, 0 unexplained discrepancies]

3. BUDGET & PROTECTED CORE CAPACITY
- Dedicated team: [# eng, # PM, # impl] | Cap: [$ loaded cost] | Window: [# weeks]
- Ring-fenced core capacity: [# of total eng, %]
- Protected core milestone(s): [Milestone name + target date]
- Explicitly displaced work (if any): [What moves and by how long]

4. TRANCHE 2 UNLOCK CRITERIA (ALL REQUIRED)
- Revenue & repeatability: [Target live accounts, ARR, standard sales motion]
- Reliability & margin: [Incident ceiling, gross contribution %, impl hours]
- Core health gate: [Core milestone shipped / SLA held]
- Next-scope proof: [Qualified pipeline blocked by excluded segment]

5. HARD STOP DATE & UNWIND TRIGGER
- Review date: [YYYY-MM-DD]
- Stop triggers: [Minimum ARR, margin floor, or support ceiling]
- Unwind plan if triggered: [Sales freeze, customer migration path, eng return]
```

The next review isn’t a vote on whether time and attendance is a good idea. It’s a check on whether the stores Rosterline can serve today are worth the people and money it would take to serve more.

---

[Series index](../series-index.md) · [Previous: Prove You Can Sell and Deliver It Twice](05-prove-you-can-sell-and-deliver-it-twice.md)

---

**This is part 6 of 6 in** [**How to Build a Second Product**](https://www.antoinebuteau.com/build-a-second-product-series-index/)**.**

- Previous: [Prove You Can Sell and Deliver It Twice](https://www.antoinebuteau.com/build-a-second-product-05-prove-you-can-sell-and-deliver-it-twice/)
- [View the full series index](https://www.antoinebuteau.com/build-a-second-product-series-index/)