Nadia can bring either customer live without bringing every store live. It took the fictional Rosterline team twenty weeks to get to that choice: four for discovery, twelve to build, and four to run the tests.

Time and attendance works profitably on standard-rule sites (83% gross contribution, zero unexplained cycle-2 discrepancies, 44%–48% less manual payroll prep). It fails on complex-overtime sites (-16% contribution, 62% of implementation hours, 71% of escalations, manual CSV fixes still required).

Nadia has three choices:

  1. Fund the full vision. Double the team to eight engineers and spend six months building a multi-jurisdiction complex-overtime engine so every site can cut over. The cost: Phase 2 of 14-Day Self-Serve Site Onboarding slips into next year, starving the $12M scheduling core.
  2. Stop completely. Walk away from time and attendance, refund both pilot fees, and revert to partner integrations. The cost: killing a product that Payroll Directors paid $2.50/employee/month for and that passed live parallel verification on 78% of tested sites.
  3. Narrow sharply and roll out with safeguards. Cut over tested standard-rule sites only, keep complex-rule sites on their incumbent timekeeping system, and protect core onboarding capacity.

Switch only the stores that passed

Alder & Pine switches its 16 standard-rule stores ($2,400/month, $28,800 ACV) and keeps its 4 complex stores on the incumbent. Harborline Fresh switches its 12 standard-rule locations ($1,500/month, $18,000 ACV) and keeps its 4 complex locations on the incumbent. Both Payroll leaders accept the split because Rosterline was transparent with the parallel-test math—and because Marcus and Priya both value accurate paychecks over a premature all-or-nothing cutover.

Nadia writes down what Sales can offer, what Payroll has to verify, and who goes back to scheduling:

  • Hard sales qualification gate. AEs may sell time and attendance only to standard-rule sites (single-state or standard 40-hour weekly overtime, single pay rate per shift, no meal-penalty or union-CBA rules). Complex sites are explicitly excluded in the order form and stay on incumbents.
  • Mandatory parallel verification. Every new account completes two consecutive parallel pay cycles and resolves all payroll-affecting discrepancies before cutover. Sites that need unsupported manual corrections stay on the incumbent.
  • Preserve core onboarding capacity. One build engineer rotates back to core scheduling, leaving 3 engineers, 1 PM (Maya), and 1 implementation lead on time and attendance. That puts 19 of 22 engineers (86%) on core—preserving full velocity to ship Phase 2 of 14-Day Self-Serve Site Onboarding.
  • A decision date. The team agrees now on what would justify putting more money into the product or stopping new sales.

What earns more funding on September 30

The team will review the rollout on September 30, in week 16.

Nadia won’t fund a dedicated complex-overtime engine unless all five conditions are met:

  1. 10+ live paying accounts (at least 120 standard-rule sites, ≥$180K incremental ARR) switched via normal AE motion.
  2. Zero severity-1 payroll-affecting post-cutover incidents across six consecutive pay cycles.
  3. ≥80% gross contribution and ≤15 implementation hours per account.
  4. Core milestone delivered: Phase 2 of 14-Day Onboarding live, with median core deployment ≤16 days.
  5. Verified demand for complexity: At least $250K in qualified pipeline blocked specifically by complex overtime rules.

Stop rule: If on September 30 live standard-site ARR is under $100K, gross contribution falls below 70%, or support exceeds 2 escalations per 10 sites per cycle, Rosterline freezes new sales, moves live sites onto maintenance or a 90-day partner migration, and returns all three engineers to core.

Copyable funding memo

Use this memo to record what you’ll fund now, what you won’t sell yet, and what would change your decision.

SECOND-PRODUCT FUNDING & SCOPE DECISION MEMO
Date: [YYYY-MM-DD]
Product / Bet: [Second Product Name]
Single-Threaded Owner: [Name, Role]
Decision: [ ] Fund Full Build  [X] Limited Rollout  [ ] Pause / Stop

1. EVIDENCE TO DATE (SEPARATE BY SEGMENT)
- Paying accounts closed (list price, no founder heroics): [# accounts, $ ACV]
- Parallel / live verification pass rate: [Segment A pass vs. Segment B fail]
- Implementation & support load: [Hours/account; % escalations by segment]
- Direct gross contribution: [% by segment, excluding R&D]

2. EXPLICIT SCOPE & SAFEGUARDS
- In scope (eligible to sell and switch): [Exact ICP / rule boundaries]
- Out of scope (stays on incumbent / disqualified): [Excluded edge cases]
- Mandatory cutover gate: [e.g., 2 parallel cycles, 0 unexplained discrepancies]

3. BUDGET & PROTECTED CORE CAPACITY
- Dedicated team: [# eng, # PM, # impl] | Cap: [$ loaded cost] | Window: [# weeks]
- Ring-fenced core capacity: [# of total eng, %]
- Protected core milestone(s): [Milestone name + target date]
- Explicitly displaced work (if any): [What moves and by how long]

4. TRANCHE 2 UNLOCK CRITERIA (ALL REQUIRED)
- Revenue & repeatability: [Target live accounts, ARR, standard sales motion]
- Reliability & margin: [Incident ceiling, gross contribution %, impl hours]
- Core health gate: [Core milestone shipped / SLA held]
- Next-scope proof: [Qualified pipeline blocked by excluded segment]

5. HARD STOP DATE & UNWIND TRIGGER
- Review date: [YYYY-MM-DD]
- Stop triggers: [Minimum ARR, margin floor, or support ceiling]
- Unwind plan if triggered: [Sales freeze, customer migration path, eng return]

The next review isn’t a vote on whether time and attendance is a good idea. It’s a check on whether the stores Rosterline can serve today are worth the people and money it would take to serve more.


Series index · Previous: Prove You Can Sell and Deliver It Twice


This is part 6 of 6 in How to Build a Second Product.